Sunday, October 17, 2010

Week 13 - Custom installion developement



I have successfully constructed and developed a custom bridge as my installation that integrates with the existing railway structure to create a wavy connection that allowed people to travel. I have not included the texture of the bridge but i intend to use something (timber and dark color) that contrast well with the existing railway structure. The porosity lenses will then capture how the manipulation of the wave movement that interacts with the passengers.

No comments:

Post a Comment